FEATURES :
- Set each group such department group, customer group
- Set plan the job production of year
- Set plan production daily of each one job and efficiency to share the slip in each one job by to share the department
- Set material use in each one the job or each one the slip
- A record the job time is work finish in each one department and the date is work finish daily
- Analyst to move plan time with the time actual is work finish, plan job the time, job the time is work finish, job the time late, job to waste
- Analyst to move material use in a job each one
- To keep history of process of each one the job or each one the slip, material use
- Analysis graph
- Able link with general ledger system automatic
FUNCTIONS :
- 1. SETUP COMPANY INFOMATION
- 2. SETUP ALL CODE
- 3. INPUT PROCESS OUT OF PLAN
- 4. INPUT REPEAT JOB TIMMING
- 5. INPUT PLAN & HOLIDAYS OF YEAR
- 6. INPUT CAPACITY OF PROCESS
- 7. INPUT JOB NOTES
- 8. INPUT CHECKING SLIP NO. 1 & 2
- 9. EXPORT JOB PRICES LIST
- 10. INPUT INVOICE
- 11. INPUT PACKING LISTS
REPORTS :
- 1. HOLIDAY OF YEAR
- 2. CUSTOMER LIST
- 3. PROCESS IN MANUFACTORY
- 4. PROCESS FIX TIME OUT OF PLAN
- 5. PROCESS TIME OUT OF PLAN
- 6. PROCESS TIMMING RATIO
- 7. REPEAT JOB PROCESS TIMMING
- 8. REPEAT JOB PRICE LIST
- 9. CAPACITY OF PROCESS
- 10. JOB CONTROL SHEET (MONTH)
- 11. JOB CONTROL SHEET ACTUAL (MONTH)
- 12. JOB CONTROL SHEET (SEQUENCE)
- 13. JOB NOTES
- 14. JOB NOTES LIST
- 15. PROCESS PLAN (BY JOB NO.)
- 16. PROCESS PLAN (TOTAL)
- 17. SLIP NO. LIST (PLAN)
- 18. SLIP NO. LIST (ACTUAL)
- 19. SLIP NO. LIST (DEFECT JOB)
- 20. SLIP NO. LIST (NOT PROCESS SW)
- 21. SLIP NO. LIST (CHECK ACTUAL)
- 22. GRAPH ACTUAL PLAN (BY SECTION)
- 23. GRAPH ACTUAL PLAN (TOTAL)
- 24. GRAPH TOTAL LOAD
- 25. LIST OF MANUFACTURING
- 26. LIST OF MANUFACTURING (BY CUSTOMER)
- 27. LIST OF MANUFACTURING (BY CONTENT)
- 28. LIST OF MANUFACTURING (BY FINISH)
- 29. MONTHLY LOAD (BY JOB)
- 30. MONTHLY LOAD (CHECK JOB)
- 31. MONTHLY LOAD (BY PROCESS)
- 32. MONTHLY LOAD (CHECK PROCESS)
- 33. DELAY TIME (BY JOB)
- 34. SCREEN REPORT JOB CONTROL SHEET
- 35. OUT PUT PLAN TIME
- 36. JOB NOT FINISH (MONTH)
- 37. METERIAL (BY SIZE)
- 38. METERIAL (BY JOB)
- 39. EXPRESS LIST
- 40. CALENDAR WEEEK
- 41. CALENDAR MONTH
- 42. Work In Process Of Section
- 43. Follow Up Progress
- 44. Slip No. List – Check Actual Skip
- 45. Slip No. List – Check Actual Date Error
- 46. Slip No. List – External Maker
- 47. Delay Time (By Section)
- 48. Delay Time (By Sequence)
- 49. Job Not Finish (By Process & Delivery)
- 50. Job Not Finish (By Process)

2. Job Costing (JCT)
2.1 FEATURES :
- The record cost of job at to delivery go to the work in each day
- The record cost of job at to work finish in each day at work finish
- Analyst cost of job at to delivery go to the work
- Analyst cost of job at to work finish
- Analyst cost of job at to working
- Analyst cost of job at to make to be equipment use in the factory
- Analyst cost of job at to make to test
- Analyst cost of job at to make to suffer
- Analyst the raw material that use go to the job each
- Analyst the part that use go to the job each
- The record history cost of job each
- To able the link with inventory finish goods system to get automatic
2.2 FUNCTIONS :
- 1. CONVENSION COST
- 2. CALCULATE CONVENSION COST
- 3. ISSUE TO PRODUCTION
- 4. RECEIVE FROM PRODUCTION
2.3 REPORTS :
- 1. COSTING CALCULATION BY PRODUCT TYPE
- 2. COSTING CALCULATION BY PRODUCT TYPE SUMMARY
- 3. COSTING CONTROL BY BALANCE B/D & INCREASE & FINISH GOODS
- 4. COSTING CONTROL BY SPOILAGE & TESTING & TOOLS
- 5. COSTING CONTROL BY SUPPLY USED & WIP
- 6. COSTING SPECIAL ACCOUNT & STOCK CONTROL
- 7. COSTING COST OF SALES BY CUSTOMER
- 8. COSTING COST OF SALES BY CUSTOMER SUMMARY
- 9. COSTING COST OF SALES BY INVOICE & PRODUCT GROUP
- 10. COSTING COST OF SALES BY CUSTOMER & PRODUCT GROUP
- 11. COSTING SALES BY INVOICE & PRODUCT GROUP